Quantitative Aptitude Important Formulas

Probability - Important Formulas,Tricks and Examples

Sample space: When we perform an experiment ,then the set S of all possible outcome is called the sample space.eg of sample space:

(i)in tossing a coin ,s={h,t}
(ii)if two coin are tossed ,then s={hh,tt,ht,th}.
(iii)in rolling a die we have,s={1,2,3,4,5,6}.

Event: Any subset of a sample space.

Probability: Probability is quantitative measure of the chance of occurrence of a particular event..let S be the sample space and E be the event .then,E subset of S.then

P(E)=n(E)/n(S).

(i) P(S) = 1 (ii) 0<P(E)<1

If A denotes (not-a),then P(A)=1-P(A).

Let A and B be two events associated with a random experiment. Then
P(A U B) = P(A) + P(B) – P(A ∩ B)

Latest Updates

Pipes and Cistern

Three taps A,B and C can fill a tank in 12, 15 and 20 hours respectively. If A is open all the time and B and C are open for one hour each alternatively, the tank will be full in?

Two pipes A and B can fill a tank in 6 hours and 4 hours respectively. If they are opened on alternate hours and if pipe A s opened first, in how many hours, the tank shall be full?

A large tanker can be filled by two pipes A and B in 60 min and 40 min respectively. How many minutes will it take to fill the tanker from empty state if B is used for first half of the time, and A and B fill it together for the other half?

A tank is filled by 3 pipes with uniform flow. The first two pipes operating simultaneously fill the tank in the same time during which the tank is filled by the third pipe alone. The 2nd pipe fills the tank 5 hours faster than first pipe and 4 hours slower than third pipe. The time required by first pipe is?

Two pipes A and B together can fill a cistern in 4 hours. Had they been opened separately, then B would have taken 6 hours more than A to fill the cistern. How much time will be taken by A to fill the cistern separately?

Two pipes A and B can fill a tank in 24 min and 32 min respectively. If both the pipes are opened simultaneously, after how much time B should be closed so that the tank is full in 18 min?

Two pipes A and B can fill a tank in 36 min and 45 min respectively. A water pipe C can empty the tank in 30 min. First A and B are opened. after 7 min, C is also opened. In how much time, the tank is full?

Two pipes can fill a cistern in 14 hours and 16 hours respectively. The pipes are opened simultaneously and it is found that due to leakage in the bottom it took 32 min more to fill the cistern. When the cistern is full, in what time will the leak empty it?

Bucket P has thrice the capacity as Bucket Q. It takes 60 turns for Bucket P to fill the empty drum. How many turns it will take for both the buckets P and Q, having each turn together to fill the empty drum?

Probability

In a class , 30 % of the students offered English, 20 % offered Hindi and 10 % offered Both.If a student is offered at random, what is the probability that he has offered English or Hindi?

In a lottery ,there are 10 prizes and 25 blanks.A lottery is drawn at random. what is the probability of getting a prize ?

Two dice are thrown simultaneously .what is the probability of getting two numbers whose product is even?

Two diced are tossed the probability that the total score is a prime number?

Two cards are drawn at random from a pack of 52 cards What is the probability that either both are black or both are queens?

Two dice are thrown together .What is the probability that the sum of the number on the two faces is divisible by 4 or 6?

A bag contains 6 white and 4 black balls .Two balls are drawn at random .Find the probability that they are of the same colour?

In a simultaneous throw of a pair of dice,find the probability of getting a total more than 7?

An unbiased die is tossed.Find the probability of getting a multiple of 3?

Latest Job Notifications

Banking Jobs

बैंकिंग कार्मिक चयन संस्थान Institute of Banking Personnel Selection(IBPS) - 7855 पद - 29/07/2022 अंतिम तिथि

SSC Recruitment

कर्मचारी चयन आयोग (एसएससी) Staff Selection Commission (SSC) - 1411 पद - 29/07/2022 अंतिम तिथि

Jobs in Rajasthan

राजस्थान अधीनस्थ और मंत्रिस्तरीय सेवा चयन बोर्ड Rajasthan Subordinate and Ministerial Services Selection Board (RSMSSB) - 5546 पद - 22-Jul-2022 अंतिम तिथि

Railway Recruitment

उत्तर मध्य रेलवे भर्ती प्रकोष्ठ Railway Recruitment Cell(NCR) - 1659 पद - 01/08/2022 अंतिम तिथि

Jobs in West Bengal

इंडियन पोस्ट सर्विस Indian Post Service - 2357 पद - 19/08/2021 अंतिम तिथि - पश्चिम बंगाल पोस्टल सर्कल

Banking Jobs

भारतीय स्टेट बैंक State Bank of India(SBI) - 6100 पद - 26/07/2021 अंतिम तिथि - CRPD/APPR/2021-22/10

SSC Recruitment

कर्मचारी चयन आयोग Staff Selection Commission(SSC) - 25271 पद - 31/08/2021 अंतिम तिथि

Jobs in Madhya Pradesh

राष्ट्रीय स्वास्थ्य मिशन मध्य प्रदेश National Health Mission MP(NRHM) - 5215 पद - 22/06/2021 अंतिम तिथि

Jobs in Punjab

पंजाब स्टेट पावर कॉर्पोरेशन लिमिटेड Punjab State Power Corporation Limited (PSPCL) - 2632 पद - 20/06/2021 अंतिम तिथि

Jobs in Chhattisgarh

स्वास्थ्य सेवा निदेशालय, छत्तीसगढ़ Department of Health & Family Welfare, Chhattisgarh - 267 पद - 26/06/2021 अंतिम तिथि